Started roof rack project
#1
CF Veteran
Thread Starter
Started roof rack project
I finally got off my butt and started the roof rack..
Came off really easy. The disassemble was super easy too. I'm having no luck with supplies though. Barely had enough paint and clear...
More pics when it's ready to install
[IMG]local://upfiles/3763/3EC3DFDB32BE4B568B03491D0163C52A.jpg[/IMG]
[IMG]local://upfiles/3763/FCF57F28F08A47689B03D17F1E481753.jpg[/IMG]
Came off really easy. The disassemble was super easy too. I'm having no luck with supplies though. Barely had enough paint and clear...
More pics when it's ready to install
[IMG]local://upfiles/3763/3EC3DFDB32BE4B568B03491D0163C52A.jpg[/IMG]
[IMG]local://upfiles/3763/FCF57F28F08A47689B03D17F1E481753.jpg[/IMG]
#3
CF Veteran
Thread Starter
RE: Started roof rack project
Subtle change I know but I hate black plastic. It all has to go eventually
Installed pics...
[IMG]local://upfiles/3763/847F1BF60F284C15A69D49D7359923AB.jpg[/IMG]
[IMG]local://upfiles/3763/8530382831534F0D9FAB1E67E4AEBB66.jpg[/IMG]
Next evolution...
[IMG]local://upfiles/3763/27B09B5ABF574A0CBFC3F905429EF3B1.jpg[/IMG]
Installed pics...
[IMG]local://upfiles/3763/847F1BF60F284C15A69D49D7359923AB.jpg[/IMG]
[IMG]local://upfiles/3763/8530382831534F0D9FAB1E67E4AEBB66.jpg[/IMG]
Next evolution...
[IMG]local://upfiles/3763/27B09B5ABF574A0CBFC3F905429EF3B1.jpg[/IMG]
#4
CF Veteran
Thread Starter
RE: Started roof rack project
If you're thinking about cleaing up the look here's some pics of the rack removed...
[IMG]local://upfiles/3763/0022EE9F4A25467A8151241956584EC0.jpg[/IMG]
[IMG]local://upfiles/3763/E33E9090EEB94274A1CD66A2E1B1B7D9.jpg[/IMG]
[IMG]local://upfiles/3763/BB259CF23E7847B88347AD9BAFFFDB16.jpg[/IMG]
[IMG]local://upfiles/3763/0022EE9F4A25467A8151241956584EC0.jpg[/IMG]
[IMG]local://upfiles/3763/E33E9090EEB94274A1CD66A2E1B1B7D9.jpg[/IMG]
[IMG]local://upfiles/3763/BB259CF23E7847B88347AD9BAFFFDB16.jpg[/IMG]
#5
RE: Started roof rack project
The roof rack mod looks awesome. Looks like you have to do the XM Antenna next
Sorry to go off topic what are your LED tails? Are those Caddy's or IPCWs?
Sorry to go off topic what are your LED tails? Are those Caddy's or IPCWs?
#6
CF Veteran
Thread Starter
RE: Started roof rack project
I modified the Escalade lights. The LEDs are nicely thought out on the Esky. The single row tail lightgives it a slim line, high end lookand as you move around the vehicle it is reflected off of the angled outer lens. (from 45 deg it relects and then again from 90degto the side) It also has two rows for brakes or turns.
Better pics in late day sun...
[IMG]local://upfiles/3763/B7B085091F704A90A18029E5A8EC8773.jpg[/IMG]
[IMG]local://upfiles/3763/4469D8553B744BACBB92A73ABE560C70.jpg[/IMG]
Better pics in late day sun...
[IMG]local://upfiles/3763/B7B085091F704A90A18029E5A8EC8773.jpg[/IMG]
[IMG]local://upfiles/3763/4469D8553B744BACBB92A73ABE560C70.jpg[/IMG]
#7
RE: Started roof rack project
thats looks nice...how long did it take you? where did u get all the supplies and did u paint them with an airbrush after u sanded them to get a better bond?
Trending Topics
#8
CF Veteran
Thread Starter
RE: Started roof rack project
I bought most of the supplies on line. I have used paintscratch.com but this stuff was from paintworldinc.com I got OEM base and clear coat in a spray canfrom them.
I used a scuff pad, soap and hot water to wash and scuff in one step then...
2 coats bullydog adhesive promoter, 2 coats regular primer, 3 coats base and 3 coats clear. I did not sand the part to remove the grain (because of the location of the part)
Removal and disassembly (labelingof pieces)-30 minutes.
Cleaning and taping off -30 mins
Paint was about 10 mins per coat+ proper wait time in between. Last 2 coats of clear the next day.
I used a scuff pad, soap and hot water to wash and scuff in one step then...
2 coats bullydog adhesive promoter, 2 coats regular primer, 3 coats base and 3 coats clear. I did not sand the part to remove the grain (because of the location of the part)
Removal and disassembly (labelingof pieces)-30 minutes.
Cleaning and taping off -30 mins
Paint was about 10 mins per coat+ proper wait time in between. Last 2 coats of clear the next day.
#10
RE: Started roof rack project
which kit did u purchase from paintworldinc.com. there are a bunch of kits and i was jus curious to see which one u purchased. also where did u get a scuff pad from? thank u for all ur help.